- 3.9Kshares
- Share
- Tweet
- Facebook Messenger
It took Reliance Infrastructure 4 years and some Rs. 4,000+ crores to build the Mumbai metro. But within a month of operation, it got slapped in the face by the mighty Mumbai rains.
The Mumbai Metro Twitter handle confirmed the incidents
The technical issue about leakage in metro was reported at 11.30 in morning.It has already been replaced and will be put to service tomorrow
— Mumbai Metro (@MumMetro) July 2, 2014
But then they ruined it with this tweet
#MumbaiMetro trains are of world class quality designed by ALSTOM; It’s quality tested by Indian Railways. Our trains are not faulty. (1/2)
— Mumbai Metro (@MumMetro) July 2, 2014
p.s. The above tweet was deleted after this story got published
(2/2) Technical issue witnessed today is not uncommon. It already has been rectified and the train is ready to serve tomorrow morning.
— Mumbai Metro (@MumMetro) July 2, 2014
As they say, never ruin an apology with an excuse.
Brace yourself, the Mumbai Metro Memes are coming
Free shower, anyone?
- 3.9Kshares
- Share
- Tweet
- Facebook Messenger